Bridge Bearing Formwork

Location: Port Adelaide South Australia

This is the formwork which will be used to cast the bridge bearings into position on top of the concrete columns. Silicon sealer was used to completely seal the formwork in order to stop any grout leakage, while at the same time holding the formwork securely in position.

Bridge Bearing Grout Formwork
Bridge Bearing Grout Formwork

You’ll notice that the original holes that were voided out during the concrete pour have been filled in with grout and new holes have been core-drilled. Why? ..

This happened because either the wrong hole centers were supplied to the formworkers, or a different size Bearing Pad was supplied in the end. Every column top had to be core-drilled in this way :o

You’ll also notice that the surface has been scabbled. This is specified as part of the job to ensure that the grout bonds properly to the concrete.

Tip: Don’t try and get away without scabbling the concrete if instructions were not given to do this job. Treat it as part of the job and do it without being told.

Share this page on Facebook

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>