Bridge Pier Starter Steel

Northern Expressway Adelaide SA

Starter steel for a 7.2 meter high concrete bridge pier which will support concrete bridge spans at Healslip Road Interchange Adelaide.

Center Pier Starter Steel
Center Pier Starter Steel

Formwork will be used to box the column just as soon as the rest of the steel is lifted into position by crane. This center pier will be 13m long, 600mm wide at the bottom and 1500mm wide at the top.

Share this page on Facebook

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>