Location: Port Adelaide SA
Precasting six cone shaped concrete structures 2 at a time for the Adelaide Aqua Port Stanvac Desalination project.
Scaffolding
The 400 mm thick bases for the concrete units was poured first and the 2600 mm cone shaped section will be added on top. After the bases are poured, the scaffolding is added to enable steel fixing, formwork erection and pouring of concrete.

Tube and Fitting Scaffold
Internal Formwork
The internal formwork is 1800 mm diameter (not cone shaped) which includes 2 x 6mm plywood layers bent into shape and screwed into the vertical timbers one layer at a time.

Cone Formwork Internal
External Formwork
The external formwork below is cone shaped. It will also be skinned with 2 x 6mm plywood layers. It will take a bit longer to screw the ply to the external formwork because of all the extra cutting into the cone shape.

Cone Formwork External
Below we see the skinned external formwork being added to the structure in 2 parts. There is no way this formwork would fit around the steel in one piece, so we split it in half, lifted it in two crane lifts and joined it all up in position.

Cone Formwork
Finished Precast Concrete Unit
Below we see the finished 30 tonne pre-casted concrete unit. It will later be placed on a barge with the other 5 units and floated out to Port Stanvac Desalination Project.

Cone Shaped Pre Cast Concrete
Plain old circular formwork is a bit easier than cone shaped formwork.