Location: Road Bridge – Port Adelaide South Australia
The reinforcement steel and concrete forms being placed onto the bridge foundation by cranes at Port River Expressway bridge construction site.

Erecting Formwork For Bridge Columns
After all four concrete forms are placed, bracing, scaffolding and guardrails will be erected which will hold the column forms in a perfectly vertical position and allow access to the top of the forms.