Concrete Bridge Abutment at Turner River WA
Location: Turner River Rail Bridge Mining Construction Site Pilbara Region, Western Australia
This concrete bridge abutment is part of a two track rail bridge which will replace the old single track rail bridge spanning across the Turner River in the Pilbara Region. The bridge will be used by BHP Iron Ore to transport iron ore to Port Hedland.
Formworkers Simon, Brad and Ed erected the formwork and finished the concrete.

[...] pads go inbetween the structure and the bridge span. For example, Bearing Pads can be fixed onto abutments, bridge columns and/or headstocks then bridge spans are fixed onto [...]
[...] The formwork used for the first concrete pour of this concrete bridge abutment. [...]