Traveling Concrete Forms For Parapets

Location: Brisbane Air-Rail Project Queensland Australia This traveling formwork system was one of four used to form up the 8 KM of concrete parapets on the Brisbane Air-Rail project. Formwork Carpenter Steve Repairing Concrete Forms The “Traveler” was 18 meters … Continue reading

Paul And Hanu At Prominent Hill

Location: Prominent Hill Mining Construction Camp South Australia Formwork Carpenters Paul and Hanu enjoy a quiet beer after erecting formwork at Prominent Hill mining construction site. The last time I saw Paul before this was in 1994 at the Dutton … Continue reading

Waiting For Concrete At Iron Duke

Location: Project Magnet – Iron Duke Mining Construction Site Whyalla South Australia Colin, Corey, Cliff and Brett waiting for the concrete to arrive for a pedestal foundation at Iron Duke mining construction site. Colin, Corey, Cliff and Brett at the … Continue reading

Snake Handling At Camp Turner

Location: Camp Turner Mining Construction Camp, Pilbara Region, Western Australia Formwork carpenters Ed and Simon get sucked into handling this non-venomous Black-Headed Python which Brad caught earlier at Camp Turner mining construction camp. Ed, Simon and Black-Headed Pilbara Python

John At Iron Duke’s Project Magnet

Location: Project Magnet – Iron Duke Mining Construction Site Whyalla South Australia Formwork Carpenter John helps out during a concrete pour by directing all the concrete trucks to the concrete pump. The pump was parked near the excavation where the … Continue reading

Claude, Kane and Chippy at Prominent Hill

Location: Prominent Hill Mining Construction Site South Australia – Weighbridge Section Formwork Carpenters Claude (left) and Chippy on each side of Boilermaker Kane setting formwork walls and welding galvanized steel at the Prominent Hill Mining Construction Site. Claude, Kane and … Continue reading