<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Formwork Blog &#187; Northern Expressway Adelaide</title>
	<atom:link href="http://formworkblog.com/public/tag/northern-expressway-adelaide/feed" rel="self" type="application/rss+xml" />
	<link>http://formworkblog.com</link>
	<description>Formwork Construction and Concrete</description>
	<lastBuildDate>Sun, 05 Feb 2012 00:18:12 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Adelaide Northern Expressway Center Pier Steel Cage</title>
		<link>http://formworkblog.com/public/1793</link>
		<comments>http://formworkblog.com/public/1793#comments</comments>
		<pubDate>Fri, 30 Apr 2010 11:49:19 +0000</pubDate>
		<dc:creator>Ed</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Bridges]]></category>
		<category><![CDATA[Columns]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Construction Workers]]></category>
		<category><![CDATA[Cranes]]></category>
		<category><![CDATA[Northern Expressway Adelaide]]></category>
		<category><![CDATA[Roadworks]]></category>
		<category><![CDATA[South Australia - SA]]></category>

		<guid isPermaLink="false">http://formworkblog.com/?p=1793</guid>
		<description><![CDATA[Here is the Center Pier Steel being crane lifted into position onto the Brigde Pier Starter Steel at Adelaide Northern Expressway Roadworks Project.. Adelaide Northern Expressway Center Pier Steel Cage The steel cage was pre-fabricated on site on top of &#8230; <a href="http://formworkblog.com/public/1793">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Here is the Center Pier Steel being crane lifted into position onto the <a href="http://formworkblog.com/public/1537">Brigde Pier Starter Steel</a> at Adelaide Northern Expressway Roadworks Project..</p>
<p class="centerimage">
<img src="http://formworkblog.com/wp-content/images/2010/04/center-pier-steel-1.jpg" alt="Adelaide Northern Expressway Center Pier Steel Cage" /><br />
Adelaide Northern Expressway Center Pier Steel Cage
</p>
<p>The steel cage was pre-fabricated on site on top of the same formwork shuttering which will be used to form-up this 6 meter tall structure.</p>
<p class="centerimage">
<img src="http://formworkblog.com/wp-content/images/2010/04/center-pier-steel-2.jpg" alt="Construction Workers To Feed The Steel Cage Into The Base" /><br />
Construction Workers To Feed The Steel Cage Into The <a href="http://formworkblog.com/public/1537">Base</a>
</p>
<p>Formworkers, steelfixers, riggers and supervisors work together feeding the cage into the base making sure that every steel bar in the cage is in the correct position in relation to the <a href="http://formworkblog.com/public/1537">starter base steel</a>.</p>
<p class="centerimage">
<img src="http://formworkblog.com/wp-content/images/2010/04/center-pier-steel-3.jpg" alt="Steel Cage Fixed Into Position" /><br />
Steel Cage Fixed Into Position
</p>
<p>After the steel cage is fixed into position, the structure is ready to be enclosed by formwork shuttering. The finished concrete structure will be a narrow 600mm at the bottom and 1500mm at the top.</p>
<a class="a2a_dd addtoany_share_save" href="http://www.addtoany.com/share_save?linkurl=http%3A%2F%2Fformworkblog.com%2Fpublic%2F1793&amp;linkname=Adelaide%20Northern%20Expressway%20Center%20Pier%20Steel%20Cage">Share/Save</a>]]></content:encoded>
			<wfw:commentRss>http://formworkblog.com/public/1793/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Bridge Pier Starter Steel</title>
		<link>http://formworkblog.com/public/1537</link>
		<comments>http://formworkblog.com/public/1537#comments</comments>
		<pubDate>Tue, 24 Feb 2009 07:31:16 +0000</pubDate>
		<dc:creator>Ed</dc:creator>
				<category><![CDATA[General]]></category>
		<category><![CDATA[Bridges]]></category>
		<category><![CDATA[Columns]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Northern Expressway Adelaide]]></category>
		<category><![CDATA[Roadworks]]></category>

		<guid isPermaLink="false">http://formworkblog.com/?p=1537</guid>
		<description><![CDATA[Northern Expressway Adelaide SA Starter steel for a 7.2 meter high concrete bridge pier which will support concrete bridge spans at Healslip Road Interchange Adelaide. Center Pier Starter Steel Formwork will be used to box the column just as soon &#8230; <a href="http://formworkblog.com/public/1537">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>
<strong>Northern Expressway Adelaide SA</strong>
</p>
<p>
Starter steel for a 7.2 meter high concrete bridge pier which will support concrete bridge spans at Healslip Road Interchange Adelaide.
</p>
<p class="centerimage">
<img src="http://formworkblog.com/wp-content/img/2009/02/center-pier-steel.jpg" alt="Center Pier Starter Steel" /><br />
Center Pier Starter Steel
</p>
<p>
Formwork will be used to box the column just as soon as the rest of the steel is lifted into position by crane. This center pier will be 13m long, 600mm wide at the bottom and 1500mm wide at the top.</p>
<a class="a2a_dd addtoany_share_save" href="http://www.addtoany.com/share_save?linkurl=http%3A%2F%2Fformworkblog.com%2Fpublic%2F1537&amp;linkname=Bridge%20Pier%20Starter%20Steel">Share/Save</a>]]></content:encoded>
			<wfw:commentRss>http://formworkblog.com/public/1537/feed</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>

